---
company: Sigma Lithium Corp
ticker: SGML
form: 6-K
filed: 2026-08-14
accession: 0001292814-26-004250
source: https://www.sec.gov/Archives/edgar/data/1848309/000129281426004250/
---

# Sigma Lithium (SGML) earnings release, August 14, 2026

Sigma Lithium Corp (SGML) · Form 6-K · Filed 2026-08-14 · [SEC filing](https://www.sec.gov/Archives/edgar/data/1848309/000129281426004250/)

INTRODUCTION &

BACKGROUND

This management’s discussion and analysis dated as of Aug 14, 2026 (this “

MD&A”) of the financial condition and results of operations of Sigma Lithium

Corporation constitutes management’s review of the key factors that affected the Company’s financial and operating performance for the six-month ended June 30, 2026. Unless inconsistent with the context, references in this MD&A to “

Sigma”,

“

Sigma Lithium” or the “

Company” are references to Sigma Lithium Corporation and its subsidiaries.

This MD&A should be read in conjunction with the audited annual financial statements of the Company for the years ended December 31, 2025 and 2024 together with the notes thereto.

Results are reported in United States dollars, unless otherwise noted.

The Company’s financial statements and the financial information contained in this MD&A were prepared in accordance with IFRS Accounting Standards (

“IFRS Accounting

Standards”) as issued by the International Accounting Standards Board (“IASB”) and the IFRS Interpretations Committee

(“

IFRIC”).

The Company’s office address is

181, Bay Street, Suite 4400, Toronto, Ontario, M5J 2T3, Canada. The Company’s common shares (“

Common Shares”) trade under the symbol “SGML” in the United States on Nasdaq and in Canada on the TSX Venture Exchange (“

TSXV”).

Additionally, Brazilian Depositary Receipts (“

BDRs”) trade under the symbol “S2GM34” in Brazil on the B3 exchange.

Further information about the Company and its operations, including the financial statements referred to above and the Company’s annual information form, is available on the Company’s website at www.sigmalithiumcorp.com, at www.sedarplus.ca

(SEDAR) and at www.sec.gov

(EDGAR).

The information herein should be read in conjunction with the technical report titled “Grota do Cirilo Lithium Project Araçuaí and Itinga Regions, Minas

Gerais, Brazil, dated March 31, 2025, with an effective date of January 15, 2025, (the “

Technical Report”), for resource and reserve estimates. The Technical Report is compliant with the National Instrument 43-101 – Standards of Disclosure for Mineral

Projects (NI 43-101).

The Technical Report includes information about the Company’s wholly-owned Grota do Cirilo lithium operations (the “

Operations”) in Brazil, such as: (i) the mineral reserve and resource estimates for the Xuxa deposit (“

Phase 1”), the Barreiro deposit (“

Phase²”) and the Nezinho do Chicão deposit (“

Phase 3” and together with Phase 2, "

Phase 2 &³”); (ii) the results of the updated feasibility study on Phase 1 (the “

Phase 1 FS”); and (iii) the results of the preliminary feasibility study on Phase 2 and 3 (the “

Phase 2 and 3 PFS”).

On January 1, 2025, the Company elected to change its presentation currency from Canadian dollars (“

CAD”) to United States dollars. This change was made to better reflect the Company’s business operations and to enhance the comparability of its financial results with those of other publicly traded companies in the mining industry. The change in presentation currency has been applied retrospectively, and comparative financial information has been restated, such as the United States dollar has always been the Company’s presentation currency, in accordance with IAS 21 and IAS 8 - Accounting Policies, Changes in Accounting Estimates and Errors.

The figures in this MD&A presented in United States dollars are referred herein as “

$”, “

US$” or “

USD” and the figures presented in Brazilian Reais are denoted as

"R$".

Readers should refer to, and carefully consider, the sections below titled “Financial Risk Factors”, “Cautionary Note Regarding Forward-Looking Information” and “Cautionary Note Regarding Mineral Reserve and Mineral Resource Estimates”.

OUR BUSINESS

Sigma Lithium is a commercial producer of high purity, environmentally sustainable, lithium oxide concentrate. The Company’s existing operations represent one of the largest hard rock lithium mining and beneficiation complexes in the world. Sigma Lithium´s operations are located in the municipalities of Araçuaí and Itinga, in the Jequitinhonha Valley, in the northeastern part of the state of Minas Gerais, Brazil. The

Company owns 100% of its assets indirectly through its wholly-owned subsidiary Sigma Mineração S.A. (“

Sigma Brazil”), which include operating assets and a leasehold area comprised of 29 mineral rights (which include mining concessions, applications for mining concessions, exploration authorizations and applications for mineral exploration authorizations) spread over 185 km², located within a broader 19,000-hectare land package held by Sigma Brazil (containing the Grota do Cirilo, Sao José, Genipapo and Santa Clara properties).

Sigma Lithium’s operations are vertically integrated, with the Company’s mine (“Mine 1”) supplying spodumene bearing material to its lithium production and processing plant (the “

Cleantech Industrial Plant”). The Cleantech Industrial Plant is designed and operated to produce a high purity lithium oxide concentrate (“

Green Lithium”) in an environmentally friendly way through a fully automated and digital dense medium separation (“

DMS”) technology process, engineered to the specifications of the Company’s customers in the rapidly expanding lithium-ion battery supply chain for electric vehicles (“

EVs”) and energy storage systems.

Sigma Lithium is taking a phased approach to a planned expansion of its operations. Phase 1 production at its mine and Cleantech Industrial Plant commenced in April 2023. At a production capacity of 270,000 tonnes per annum of 5% lithium oxide concentrate, Phase 1 has positioned the Company as a globally relevant,

Tier-1 lithium oxide concentrate producer. Sigma Lithium issued a Final Investment Decision (“

FID”) on its Phase 2 project on April 1, 2024. Phase 2 would take consolidated capacity to 520,000 tonnes per annum of 5% lithium oxide concentrate. The existing... (truncate built with the Phase 1 mine and Cleantech Industrial Plant is expected to support two additional production lines, with each of the two planned phases of expansion, Phase 2 and Phase 3, designed to follow a similar flowsheet as demonstrated in Phase 1.

The Sigma Lithium Cleantech Industrial

Plant also produces tailings that consist of a low-grade, high-purity, zero-chemical, hyperfine by-product (“

Green By-Products”) with approximately 1.0% lithium oxide content. Provided lithium market conditions are favorable, these Green By-Products can be sold as high purity lithium fines. Alternatively, they can be sold as an input for different industries. In addition, from time to time, the Company may commercialize other lithium oxide concentrate products with lithium oxide content between 1% and 5%. These sales strengthen Sigma

Lithium’s ESG-centric approach, as they result in a “zero tailings” strategy, greatly minimizing the environmental footprint of tailings storage with a positive ecosystem impact, while also generating an additional revenue stream for the Company.

Since its inception in 2012, the Sigma

Lithium’s mission has emphasized environmental, social, and governance (“

ESG”) practices to support sustainable development. The Company is actively engaged in social programs that promote sustainable development and inclusion.

FINANCIAL HIGHLIGHTS

For the three-month period ended June 30, 2026, the Company notes the following financial highlights:

▪ Net sales revenue of $54.7 million, up by 3.2x on a year-over-year basis and marking the highest ever quarterly revenue.

▪ Adjusted EBITDA margin of 47.0%, also the highest in the Company’s history.

▪ Net debt reduced by 9% from December 31, 2025 to $125 million.

OPERATIONAL HIGHLIGHTS

Table 1

: Summary of

Key Phase 1 Operating Metrics (for the six-month period ended June 30, 2026):

(1)

Figures in 1,000 tonnes. Includes lower grade lithium oxide concentrates reclassified as lithium products. For 2Q26, the lower grade lithium oxide concentrates, shown as the equivalent volume of high grade lithium oxide concentrate (adjusted for 5% lithium oxide content).

Mining Operations Update

The six-month period ended June 30, 2026, marked the final phase of a restructuring of mining operations that aimed to increase capacity and improve efficiency by using larger equipment, such as trucks and excavators, and bringing mining operations in-house instead of using a mining contractor. The Company’s primary focus was on the restart and the continuing ramp-up of mining operations to support and optimize throughput of the Cleantech Industrial

Plant.

Operational efforts during the period were concentrated on:

As a result, the Company progressed a controlled restart of mining activities, with production ramp-up following a phased and operationally disciplined approach.

Since the week started July 17, 2026, mining operations have been halted as part of a partial suspension of Sigma Lithium’s operations, pending the closing with the Minas Gerais state government of a terms for adjustment of procedures ("

Termo de Ajuste de Conduta

" or "

TAC Agreement

"), which is a standardized form of agreement that must be mutually agreed between federal and state regulatory bodies and the company. The

TAC Agreement is designed to address certain issues raised by the Vale do Jequitinhonha branch of the Minas Gerais state environmental enforcement body (see the details below under “Licensing Updates”).

Sigma Lithium anticipates finalizing the TAC Agreement, following which the Company expects to resume mining activities. As noted above, the post-restructuring ramp-up of mining operations, which began in January 2026, has involved the phased deployment of increasingly larger mining equipment. Once mining activities resume following the current temporary halt, the Company expects to continue this process and implement the next phase of equipment upgrades.

Cleantech Industrial Plant Update

In the six-month period ended June 30,

2026, the Cleantech Industrial Plant successfully transitioned from a maintenance-focused period achieving increased throughput. The Company executed a series of critical plant readiness initiatives, which translated into a smooth restart and ramp-up of production.

Since the week beginning July 17, plant operations have also been halted as part of the partial suspension of Sigma Lithium’s operations pending the closing of the TAC

Agreement referred to above. Operations related to the sale of high-purity lithium fines, consisting of tailings generated by previous production, have continued without disruption. The Company anticipates that the Cleantech Industrial Plant will restart as soon as the

TAC Agreement is finalized, either performing retreatment or processing fresh ore delivered by the restarted mining operations.

Phase 2 Development Progress

The restructuring and upgrade of mining operations ensured a strong and reliable foundation for the Phase 2 expansion. The Company continues to target the progression of long lead items with the objective of enabling construction commencement at the end of 2026 or the beginning of 2027, subject to final alignment of operational readiness and investment timing.

Table²

: Uses of Cash Analysis for Phase 2 Construction

Licensing Updates

On December 21, 2024, Sigma Lithium obtained the Preliminary License, the Installation License, and the Operating License (“

LP

", “

LI” and “

LO”, respectively) for Mine 2, which is the Barreiro mine. The approval was unanimous by the State Environmental Policy Council (“

COPAM”), the board responsible for voting and awarding environmental licenses in the State of Minas Gerais, including the votes of non-governmental organizations representatives. This milestone enables Sigma Lithium to expand its mineral lithium production capacity up to 5.5 million tonnes per year.... (truncated)24, Sigma Lithium was awarded its

LP, LI and LO to install and operate its second Cleantech Industrial Plant by the State of Minas Gerais. The Company, once again, received unanimous approval from all board members of the COPAM, including the board members representing the NGOs. The obtainment of the

LP, LI and LO for Sigma Lithium’s second Cleantech Industrial Plant allows the Company to further expand its industrial beneficiation and processing capacity of lithium minerals to up to a total of 3.7 million tonnes per year.

On February 9, 2026, the National Mining Agency (“ANM”) confirmed that the mining concession application for the Barreiro mine ("Mine 2") was in compliance with all applicable regulatory requirements.

On July, 22 2026, as mentioned above, Sigma Lithium started negotiating with the Minas Gerais state government a terms for adjustment of procedures ("

Termo de Ajuste de Conduta

" or "

TAC Agreement

", which is a standardized form of agreement that must be mutually agreed between federal and state regulatory bodies and the company. The negotiations follow a notification by the Vale do Jequitinhonha branch of the Minas Gerais state environmental enforcement body, based in the town of Diamantina, which included the issuing of fines totaling approximately $0.54 million and required a partial suspension of the Company’s operations. Several fines were related to the period from 2013 to 2022.

Sigma Lithium vehemently denies any wrongdoing with respect to the key claims raised in connection to the Company's operations. Sigma Lithium confirms that: a)

The Company has not misrepresented any information filed with the environmental authorities since 2018; b)

The Company has not commercially sold any lithium materials prior to May 2023; and c)

The Company denies the claims alleging that 2 houses located outside of Sigma Lithium’s licensed area are negatively impacted by its activities.

The Company has agreed to a settlement to be established by the TAC Agreement, in addition to the payment of up to $0.54 million for the above mentioned fines. In parallel to negotiating the

TAC Agreement, Sigma Lithium has filed a significant amount of factual and quantitative environmental evidence supporting its defense to the claims related to its current operations with FEAM, the environmental regulator of Minas Gerais state. The Company estimates that the execution of the proposed adjustments of environmental procedures under the TAC Agreement will require an estimated capex of approximately

$1.0 million. The closing of the TAC agreement is to be followed by the resumption of full operational activities.

ESG & SUSTAINABILITY

HIGHLIGHTS

Sigma Lithium is committed to leading the way in socially and environmentally sustainable lithium. The Company’s approach to sustainability reflects not only the Company´s regulatory obligations, but also the evolving expectations of the Sigma Lithium’s stakeholders, including customers, investors, local communities, employees, and public institutions.

Health & Safety

In the six months to June 30, 2026, the Company recorded a zero Total Recordable Injury Frequency Rate (TRIFR), defined as the number of injuries, excluding fatalities, requiring medical treatment per million hours worked. As of June 30, 2026, Sigma Lithium completed 1,060 consecutive days without a Lost Time Injury (LTI).

Environmental Programs

Sigma Lithium’s production process is designed to maximize sustainability and minimize environmental impacts, with the use of 100% renewable electricity, zero tailings dams and zero use of hazardous chemicals. The Company runs several environmental programs. Some of the key programs are outlined below.

Land use and biodiversity management:

Control of pollution and waste:

Social Programs

Sigma Lithium runs several community outreach programs, which include holding monthly meetings with local communities and other structured initiatives. The Company also runs voluntary social programs, some of which are outlined below.

“Fundo Dona de Mim” Microcredit Program

The Fundo Dona de Mim microcredit program was launched in partnership with

Brazil´s most prominent support organization for women, Grupo Mulheres do Brasil, with the aim of promoting female entrepreneurship in Sigma Lithium’s local communities. The program has benefited local women with small businesses in the areas of food, crafts, clothing and services.

Zero Drought Program

Under this program, Sigma Lithium builds small rainwater capture structures in the local municipalities of Araçuaí and Itinga, benefiting small-scale farmers. The reservoirs store water for the irrigation of crops during periods of drought.

Water for All Program

Sigma Lithium provides drinking water to local households through a partnership with the municipalities of Araçuaí and Itinga. Sigma Lithium donated water tanks and funds water deliveries by truck from the local water utilities, COPANOR and COPASA, supplying the local communities on a regular basis.

Education that Transforms Program

Sigma Lithium has several initiatives dedicated to the education of children and adolescents in its local municipalities of Araçuaí and Itinga. The Company facilitated the renovation and expansion of three municipal public schools has ongoing educational programs and several initiatives in cultural and sports education through partnerships with local groups.

Corporate Governance

SELECTED FINANCIAL

INFORMATION

(1)

On January 1, 2025, the Company started to present its financial statements in United States dollars as mentioned in “Introduction & Background” section.

Q2 2026

Net loss of $2.6 million for the three-month period ended June 30, 2026, derived from net revenues of $54.7 million, offset by $21.9 million in cost of goods sold,... (truncated)sed its PP&E of

$139 million regarding to Leasing equipment’s used in operations.

Q1 2026

Net income of $11.1 million for the three-month period ended March 31, 2026, derived from net revenues of $42.3 million, offset by $16.8 million in cost of goods sold, $10.1 million in expenses and $4.3 million in income tax and social contribution.

Q4 2025

Net loss of $24.5 million for the three-month period ended December 31, 2025, derived from net revenues of $16.9 million ($14.4 million in final adjustments on previously provisionally priced sales and $2.5 million in shipping service revenues), offset by $3.4 million in cost of goods sold, $27.1 million in expenses and $10.9 million in income tax and social contribution.

Q3 2025

Net loss of $11.6 million for the three-month period ended September 30, 2025, derived from $30.4 million in gross sales revenue and $1.0 million in shipping services, offset by $2.9 million in provisional pricing adjustment, and $30.1 million in cost of goods sold and distribution costs.

Q2 2025

Net loss of $18.8 million for the three-month period ended June 30, 2025, derived from $21.1 million in gross sales revenue and $1.2 million in shipping services, offset by $5.4 million in provisional pricing adjustment, and $23.5 million in cost of goods sold and distribution costs.

Q1 2025

Net income of $4.7 million during the three-month period ended March 31, 2025, consisted of a gross profit of $13.5 million, obtained from $47.7 million in net sales revenue and $34.2 million in cost of goods sold and distribution costs.

Q4 2024

Net loss of $8.5 million during the three-month period ended December 31, 2024, consisted of a gross profit of $15.3 million, obtained from $47.3 million in net sales revenue and $32.1 million in cost of goods sold and distribution costs.

Q3 2024

Net loss of $25.1 million during the three-month period ended September 30, 2024, consisted of net sales revenue $20.9 million as a result of provisional price adjustment due to the decrease in average prices realized during the period and $29.2 million in cost of goods sold and distribution costs.

Selected consolidated financial information is as follows:

Results of Operations

Three-Month Period

Ended June 30, 2026 compared to Three-Month Period Ended June 30, 2025

The following table shows selected financial information for the three-month periods ended June 30, 2026, and June 30, 2025:

The change in net income for the three-month period ended June 30, 2026, compared to the three-month period ended June 30, 2025, is primarily attributable to:

Net sales revenue

(1)

Gross sales revenue is reported on a FOB basis.

Expenses by category

The following table summarizes the Company’s expenses by category for the three-month period ended June 30, 2026, and June 30, 2025.

(1)

For the three-month period ended June 30, 2026 and, cost of goods sold includes $961 related to stock-based compensation.

(2)

Applicable Royalties: i.) 2.0% ‘Compensação Financeira pela Exploração de Recursos Minerais’ (CFEM), a royalty on mineral production levied by the Brazilian government, payable on the price of minerals extracted from the

Lithium Properties. ii.) A royalty (currently held by LRC LP I, an unrelated party) of 1% of net revenues from sales of minerals extracted from the Lithium Properties. iii.) Brazilian law requires paying landowner’s royalties equal to 50% of the CFEM, which is described above.

Sales and administrative expenses were $4.6 million compared to $4.5 million in the same period of 2025. The increase was driven primarily by higher legal expenses.

Other operating expenses, net

(1)

The Company implemented a restructuring of its mine operations to enhance operational efficiency, started during the fourth quarter of 2025, which led to idle capacity at its industrial plant. Includes depreciation and depletion of assets amounting to US$5,196 for the three-month period ended June 30, 2026.

Stock-based compensation

Financial expenses, net

Income tax and social contribution

For the three-month period ended June 30,

2026, income tax and social contribution rose to $2.7 million from $ zero in the same period in 2025, primarily due to the increase in current tax expenses resulting from the transition from having pre-tax losses to taxable income

Six-Month Period Ended

June 30, 2026 compared to Six-Month Period Ended June 30, 2025

The following table shows selected financial information for the six-month period ended June 30, 2026, and June 30, 2025:

The change in net income for the six-month period ended June 30, 2026, compared to the six-month period ended June 30, 2025, is primarily attributable to:

Net sales revenue

(1)

Gross sales revenue is reported on a FOB basis.

Expenses by category

The following table summarizes the Company’s expenses by category for the six-month periods ended June 30, 2026, and June 30, 2025.

(1)

For the six-month period ended June 30, 2026 and, cost of goods sold includes $1,026 related to stock-based compensation.

(2)

Applicable Royalties: i.) 2.0% ‘Compensação Financeira pela Exploração de Recursos Minerais’ (CFEM), a royalty on mineral production levied by the Brazilian government, payable on the price of minerals extracted from the

Lithium Properties. ii.) A royalty (currently held by LRC LP I, an unrelated party) of 1% of net revenues from sales of minerals extracted from the Lithium Properties. iii.) Brazilian law requires paying landowner’s royalties equal to 50% of the CFEM, which is described above.

Sales and administrative expenses were $8.3 million compared to $9.5 million in the same period of 2025. The decrease was primarily driven by a decline in legal expenses.

Other operating expenses, net

(1)

The Company... (truncated)uring the fourth quarter of 2025, which led to idle capacity at its industrial plant. Includes depreciation and depletion of assets amounting to US$7,177 for the six-month period ended June 30, 2026.

Stock-based compensation

Financial expenses, net

Income tax and social contribution

For the six-month period ended June 31, 2026, income tax and social contribution increased to $7.0 million from $5.0 million in the same period in 2025 primarily due to the impact on current taxes of the transition from having pre-tax losses to taxable income and the effect on deferred taxes of changes in unrealized foreign exchange gains.

Non-GAAP Measure

Adjusted earnings before interest, taxes, depreciation and amortization (“Adjusted EBITDA”)

EBITDA is a non-GAAP measure, which is calculated using the net loss for the period and excluding the amounts charged as (i) depreciation and depletion, (ii) financial expenses and (iii) income taxes.

Adjusted EBITDA is meaningful for the stakeholders, since the Company can demonstrate the effective EBITDA, considering the stock-based compensation impact on net loss. Since this item is non-cash, the reconciliation below is necessary and relevant for understanding the Company´s EBITDA measurement, as shown below:

(1)

Calculated over net revenue of $54,700 for the three-month period ended June 30, 2026, $16,888 for the same period in 2025, $97,042 for the six-month period ended June 30, 2026 and $64,560 for the same period in 2025.

Liquidity and Capital Resources

Liquidity Outlook

As of June 30, 2026, the Company’s cash and cash equivalents totaled $16.7 million. Total debt was $136.1 million and short term debt was $123.4 million, mostly comprised of

$119.9 million in export prepayments. Net debt stood at $119.4 million.

Operating Activities

For the six-month period ended June 30, 2026, cash provided by operating activities was $27.2 million compared to cash used in operating of $8.2 million for the same period in 2025.

The increase was mainly due to:

Investing Activities

For the six-month period ended June 30, 2026, cash used in investing activities was $4.4 million compared to $8.1 million in the same period of 2025, a slight decrease primarily due to $2.6 million in lower additions to geological expenditures and property, plant and equipment, and a drop of $1.0 million in advances for land acquisitions.

Financing Activities

For the six-month period ended June 30, 2026, cash used in financing activities was $12.5 million compared to $17.9 million in the same period of 2025, primarily due to lower net loan repayments, partly offset by an increase in payments of lease liabilities resulting from the Company entering new lease agreements related to the abovementioned mining restructuring and upgrade.

Operations and liquidity

These financial statements have been prepared on a going concern basis in accordance with IFRS Accounting Standards. The going concern basis of presentation assumes that the Company will continue its operations for the foreseeable future and will be able to realize its assets and discharge its liabilities and commitments in the normal course of business.

As of June 30, 2026, the Company reported negative working capital of $175.7 million which may cast significant doubt on the Company’s ability to continue as a going concern as of that date.

However, based on the Company´s recent operating performance and cash flow generation, management is comfortable with the Company´s ability to continue operating as a going concern as a result of management expectation regarding the realization of the Company´s future cashflows, current strong lithium market conditions, as well as the actions currently being undertaken to successfully execute its business plan, including increasing revenues while managing operating expenses.

On October 6, 2025, as part of the implementation of management’s business plan, the Company announced a restructuring of its mining operations to increase capacity and improve efficiency by bringing mining operations in-house instead of using a mining contractor and using larger equipment, such as trucks and excavators.

With the upgrade, management anticipates being able to markedly improve the Company’s operating margins. During the time the mine was demobilized, the Company’s Cleantech Industrial Plant continued to operate, reprocessing tailings.

In December 2025, the Company signed an offtake agreement for 70,500 tonnes of high grade lithium oxide concentrate to be supplied during 2026. This agreement provides a working capital revolver of $96.0 million to be disbursed in fixed monthly installments of $8.0 million. For the six-month period ended June 30, 2026, the Company recognized net revenues of $51.9 million of high-grade lithium oxide concentrate under this agreement.

For the six-month period ended June 30, 2026, the Company recognized net revenue of approximately $45.0 million as a result of the sale of low-grade material (high-purity lithium fines).

CURRENT

SHARE DATA

Issued and outstanding securities of the Company as at the date of this MD&A were as follows:

RELATED PARTY TRANSACTIONS

A summary of the related parties to Sigma Lithium is set out below:

Transactions with related parties

Reimbursement of company expenses paid by A10 Group:

Certain expenses attributable solely to Sigma Lithium during the period were paid by the A10 Group on the Company’s behalf and were later reimbursed to A10 Group at cost by the Company, with no profit element. Such expenses were limited to: (i) the cost of three administrative personnel 100% allocated to Sigma Lithium; and (ii) health insurance expenses of certain individuals formerly related to the A10 Group and who are now exclusively at Sigma Lithium, which continue to be paid by A10 Group. For... (truncated)reimbursement of Sigma Lithium's own expenses and do not constitute revenue, income, or any form of compensation to A10 Group. Marcelo Paiva, who indirectly controls A10 Group and is also Co-Chair and a director of Sigma Lithium, does not receive any compensation or benefits in any way as part of these reimbursements.

Leasing Agreements

:

The Company has right-of-way lease agreements with Miazga and Arqueana relating to access to Sigma Lithium’s industrial facilities

(See note 14).

Royalties

:

Pursuant to Brazilian legislation, royalties are payable to landowners whose properties are subject to mineral exploration activities.

The amount of these royalties are equivalent to 50% of the value paid as Financial Compensation for the Exploration of Mineral Resources

(CFEM) to Brazil’s National Mining Agency (Agencia Nacional de Mineração). As of June 30, 2026, the Company recognized an amount payable to Miazga of $1,891 ($1,325 as of December 31, 2025) in landowners’ royalties.

Loan agreements (Tatooine):

On April 20, 2023, Sigma Brazil entered into a loan facility agreement with Tatooine, to fund the purchase by Tatooine of several properties located in areas of interest of the Company. The loan facility agreement provides for loans of up to $12,000. On November 14, 2024, this limit was amended to $15,000. The facility bears a 15% p.a. interest rate. The loan facility agreement is set up so that loan amounts can be made available via requests made by Tatooine to Sigma Brazil, where the amounts for the acquisition of each property and their corresponding expected costs and expenses are specified. Loans granted by Sigma Brazil to Tatooine under this loan facility agreement totaled $21,641 as of June 30, 2026 ($18,542 as of December 31, 2025), of which $13,912 represents loan disbursements, $7,176 corresponds to capitalized interest and remaining amount of $553 as CTA adjustment ($5,304 as of December 2025). During the year of 2025 Sigma Lithium entered into a loan agreement with Tatooine, bearing an interest rate of 12% p.a. As of June 30, 2026 the balance of loans under this agreement was $8,721 ($5,653 as of December 31, 2025).

Instituto Lítio

Verde (“ILV”):

Sigma Brazil and ILV are parties in the development of Sigma Lithium’s operations, which have a high degree of positive impact in the communities surrounding the Company’s operations in the Vale do Jequitinhonha region. ILV’s purpose is to promote the well-being and the economic development of those communities.

Key management personnel

Key management includes the directors of the Company, the executive management team and senior management at Sigma Lithium.

FINANCIAL RISK

FACTORS

The Company is exposed to a variety of financial risks such as credit risk and liquidity risk, including interest rate risk, foreign currency risk.

The fair values of cash and cash equivalents, accounts payable, export prepayment trade finance and credits from related parties approximate their carrying amounts due to the short-term maturity of these financial instruments.

Credit Risk

Sigma Lithium has a credit risk management policy, which aims to minimize the possibility of not receiving sales made and amounts invested, deposited or guaranteed by financial institutions and counterparties, through analysis, granting and management of credits, using quantitative and qualitative parameters.

The Company manages its credit risk by receiving in advance a substantial portion of its sales or by having receivables guaranteed by letters of credit.

Credit granted to financial institutions is used to accept guarantees and invest cash surpluses.

Liquidity Risk

Liquidity risk is the risk that the Company will not be able to meet its financial obligations as they fall due. Sigma Lithium’s approach to managing liquidity is to ensure that the

Company will have sufficient liquidity to meet liabilities when due.

Sigma Lithium’s management of cash is focused on funding ongoing capital needs for operating the Cleantech Industrial Plant, developing the Company’s growth opportunities

(including Phase 2) and for general corporate expenditures.

The Company continuously monitors its cash outflows and seeks opportunities to minimize all costs, to the extent possible, as well as its sales and administrative expenses.

(1) The amounts presented include all obligations until the maturity date, unlike accrual basis used in the Financial Statements.

As of June 30, 2026, out of the total

$60,459 due to suppliers, $29,603 (49.4%) relates to amounts disputed by the Company, primarily in connection with services that were either not provided at all or were not provided in accordance with the applicable contractual terms. These liabilities are under dispute and were assessed as possible, with any potential cash outflow beyond 12 months. However, to ensure compliance with the IFRS Accounting

Standards, Sigma Lithium maintained the balance under suppliers, pending the conclusion of any reassessment by the Company’s legal counsel. As of December 31, 2025, out of the total $49,524 due to suppliers, $25,678 (51.8%) related to disputed amounts.

The Company restructured mining operations to increase efficiency, and this involved a change of certain suppliers. The amounts in dispute are partly the result of a mine demobilization made at the start of the restructuring in October 2025, which was followed by a remobilization in January 2026 using a separate set of suppliers.

Moreover, there are loans outstanding that should be redeemed in 2026, and their repayments are recognized at the amortized cost (accruals basis) as follows:

¹ As per note 8 of the Company’s financial statements for the six months ended June 30, 2026.

The net amount payable to settle... (truncated)l under this agreement. As of June 30, 2026, the net amount payable with respect to this agreement was $94,597 ($89,364 as of December 31,

2025).

Interest Rate Risk

This risk can arise from short and long-term financial investments, financing and export prepayment, which may be linked to fixed and floating interest rates, such as rates based on the CDI,

SELIC and SOFR, exposing these financial liabilities to interest rate fluctuations, as shown in the sensitivity analysis framework below.

The Company considered the scenario most probable and scenarios 1 and 2 of changes in interest rates volatility.

The interest rates used in the sensitivity analysis in their respective scenarios are shown below together with the effects on the profit and loss balances for the period ended June 30, 2026:

(1)

Sensitivity analysis of the scenario probable was measured using as reference the rates on July 27, 2026.

Foreign Currency Risk

The exposure arises from the existence of assets and liabilities generated or denominated in US Dollar, since the Company's functional currency is the Brazilian Real. The consolidated exposure as of June 30, 2026 was as follows:

We present below the sensitivity analysis for foreign exchange risks. The Company considered a probable scenario (1) and scenarios 1 and 2 as 10%, and 20%, respectively, of deterioration for the volatility of the currency, using as reference the exchange rate on June 30, 2026.

The currencies used in the sensitivity analysis and its scenarios are shown below:

The effects on profit and loss, considering the probable scenario and scenarios 1 and 2 are shown below:

(1) Sensitivity analysis of the probable scenario was measured using as reference the exchange rate, published by the Central Bank of Brazil on July 30, 2026.

Changes in Directors and

Management

Except for the changes to the Board noted in the Corporate

Governance section of this report, there were no other changes in directors or management during the three-month period ended June 30,

2026.

Litigation Updates

On March 18, 2024, the Company received an Initiation Letter of Arbitration by LG Group subsidiary, LG Energy Solution, Ltd. (“LG-ES”) from the International Centre for Dispute Resolution of the American Arbitration Association. LG-ES is alleging that Sigma Lithium is in breach of certain provisions in connection with the term-sheet dated October 5, 2021, relating to offtake arrangements for the purchase of lithium oxide concentrate from the Company. The Term-Sheet was subject to, amongst other things, completion of the negotiation of definitive written agreements between the parties. The Company believes the claims are without merit. The legal counsel of the Company has formally attributed the probability of LG prevailing in this arbitration as possible. The amount involved is currently undetermined.

On October 31, 2025, Fagundes Construção e Mineração S.A., a former mining contractor, initiated an arbitration against Sigma Mineração S.A. The discussion is related to the performance of the parties under the services agreement that has been terminated. The Company believes the claims are without merit. The Company is preparing its defense and counterclaim with the support of its legal counsel. The probability of loss is possible.

As of June 30, 2026, the Company was involved in civil and labor lawsuits totaling $27,457 for which the likelihood of loss has been assessed as possible by Sigma Lithium’s external legal advisors, and $5,746 for cases assessed as probable losses, for which accounting provisions have been recognized.

DISCLOSURE,

CONTROLS & PROCEDURES

The CEO and CFO of the Company are responsible for establishing and maintaining disclosure controls and procedures (“

DC&P”) for the Company as defined under National

Instrument 52-109 (NI 52-109) issued by the Canadian Securities Administrators and in Rule 13a-15d - 15(e) under the U.S. Securities Exchange

Act of 1934, as amended (the “

Exchange Act”). The purpose of the DC&P is to provide reasonable assurance that information required to be disclosed by the Company in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in the securities legislation and include controls and procedures designed to ensure that information required to be disclosed by an issuer in its annual filings, interim filings or other reports filed or submitted under securities legislation is accumulated and communicated to the Company’s management, including its certifying officers, as appropriate, to allow timely decisions regarding required disclosure. The CEO and CFO of the Company concluded that, as a result of material weaknesses in internal controls over financial reporting, the Company’s disclosure controls and procedures were not fully effective.

Considering these material weaknesses, management performed additional analyses and other procedures to ensure that the Company’s consolidated financial statements were prepared in accordance with IFRS Accounting Standards, as issued by the International Accounting Standards Board.

Accordingly, management believes that the Company’s consolidated financial statements fairly present, in all material respects,

Sigma Lithium’s financial position, results of operations, and cash flows as of and for the periods presented, in accordance with

IFRS Accounting Standards.

INTERNAL CONTROL

OVER FINANCIAL REPORTING

Management is responsible for establishing and maintaining adequate internal controls over financial reporting, as such term defined in NI 52-109 and Rule 13a-, 15d - 15(f) of the

Exchange Act.

An evaluation of the effectiveness of internal controls over financial reporting was conducted based upon criteria established in

Internal Control – Integrated Framework

(2013) by the Committee of

Sponsoring Organizations of the Treadway Commission. Based on that evaluation, it was concluded that the Company’s internal controls over financial reporting demonstrated certain material weaknesses, as described below.

A material weakness in internal controls over financial reporting is indicative that there is a reasonable possibility that a material misstatement of the Company’s annual or interim financial statements may not be prevented or detected on a timely basis.

Management has identified the following material weaknesses:

The control deficiencies described above created a reasonable possibility that a material misstatement to the consolidated financial statements would not be prevented or detected on a timely basis. Therefore, Sigma Lithium concluded that the deficiencies represent material weaknesses in the Company’s internal control over financial reporting and that the Company’s internal control over financial reporting was not effective as of December 31, 2025

The Company engaged Grant Thornton Auditores

Independentes Ltda. (“Grant Thornton”) to perform an “integrated audit” which encompassed an opinion of the Company’s annual consolidated financial statements as of and for the year ended December 31, 2025, as well as an opinion on the effectiveness of the Company’s Internal Control over Financial Reporting (“ICFR”) as of December 31, 2025. Grant Thornton, the Company’s independent registered public accounting firm, audited the Company's consolidated financial statements and issued an adverse opinion on the effectiveness of ICFR. Grant Thornton‘s attestation report on the Company’s ICFR was incorporated by reference into the

Company’s annual report on Form 40-F under the Exchange Act for the year ended December 31, 2025.

MANAGEMENT’S

REMEDIATION PLAN

Sigma Lithium’s efforts to address the material weaknesses mentioned above are ongoing. The Company intends to sustain initiatives aimed at enhancing the internal control environment throughout 2026.

The Company has conducted a comprehensive review of internal control procedures and has been actively pursuing steps to address and remediate the identified material weaknesses, as follows:

Further to the steps to remediate the material weaknesses described above, the Company is pursuing the following:

Sigma Lithium believes that the Company’s remediation plan will adequately address the identified material weaknesses and bolster internal controls over financial reporting. The

Company took steps toward remediation during the 2025 fiscal year and is working towards having its internal controls environment free of material weaknesses by the end of fiscal year 2026.

CHANGES IN

INTERNAL CONTROL OVER FINANCIAL REPORTING AND REMEDIATION

As described above under Remediation

Efforts to Address the “Material Weaknesses”, we are taking actions to remediate the material weaknesses in our internal control over financial reporting. Some changes were implemented in our internal control over financial reporting (as defined in Rules

13a-15(f) and 15d-15(f) under the Exchange Act) occurred during the year ended December 31, 2025 that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

CRITICAL ACCOUNTING

ESTIMATES

Please refer to the Company’s annual MD&A for the year ended December 31, 2025, for Estimation Uncertainty and Accounting Policy Judgments disclosure. The nature and amount of significant estimates and judgements made by management in applying the Company’s accounting policies and the key sources of estimation uncertainty as well as accounting policies applied during the six months ended June 30, 2026, were substantially the same as those that management applied to the consolidated financial statements as at and for the year ended December 31, 2025.

NEW ACCOUNTING

STANDARDS AND INTERPRETATIONS

Standards issued effective in 2026

The amendments to

IFRS 9 – Financial Instruments and

IFRS 7 – Financial Instruments: Disclosures aim to enhance the clarity of classification, measurement, and disclosure of financial instruments. The updates consist of:

The Company assessed this standard and concluded that it did not have a material impact on the financial statements.

Standards issued but not yet effective in 2026

The International Accounting Standards

Board (IASB) has issued new requirements for the presentation and disclosure of information in general purpose financial statements to ensure they provide relevant and faithful representations of an entity's assets, liabilities, equity, income, and expenses. The objective is to offer financial information that helps users assess the prospects for future net cash inflows and evaluate management’s stewardship of the entity’s economic resources.

These financial statements comply with IFRS Accounting Standards, adhering to both general and specific requirements for presenting information in the statement of financial performance, the statement of financial position, and the statement of changes in equity. The requirements include aggregation and disaggregation of information to ensure clarity, a comprehensive statement of profit or loss, and the presentation of totals and subtotals for key financial metrics. This standard, issued in April 2024, is effective for annual periods beginning on or after January 1, 2027, and the Company is assessing the impacts arising from this standard on the presentation and disclosures in the financial statements

OFF-BALANCE SHEET ARRANGEMENTS

As of the date of this MD&A, the Company does not have any off-balance sheet arrangements that have, or are reasonably likely to have, a current or future effect on the financial performance or financial condition of the Company, including, and without limitation, such considerations as liquidity and capital resources.

CAPITAL MANAGEMENT... (truncated)g its capital is to ensure that the Company is able to safeguard its ability to continue as a going concern, continue its operations, and has sufficient capital to be able to meet its strategic objectives, including the continued exploration and development of its existing mineral projects and the identification of additional projects. The Company’s primary source of capital is derived from equity issuances. As of June 30, 2026, capital consisted of equity attributable to common shareholders of $82,295 ($56,630 as of December 31, 2025). The Company has no externally imposed capital requirements and manages its capital structure in accordance with its strategic objectives and changes in economic conditions. In order to maintain or adjust its capital structure, the Company may issue new shares in the form of private placements and/or secondary public offerings. There has been no change in the Company’s approach to capital management since the end of the three-month period ended June 30, 2026.

QUALIFIED PERSON

Please refer to the Company’s National

Instrument 43-101 technical report titled “Grota do Cirilo Lithium Project Araçuaí and Itinga Regions, Minas Gerais,

Brazil” issued March 31, 2025, which was prepared for Sigma Lithium by Marc-Antoine Laporte, P.Geo, SGS Canada Inc., William van

Breugel, P.Eng, SGS Canada Inc., Johnny Canosa, P.Eng, SGS Canada Inc., and Joseph Keane, P. Eng., SGS North America Inc. (the “Technical

Report”). The Technical Report is filed on SEDAR+ and is also available on the Company’s website.

The independent qualified person (QP) for the

Technical Report’s mineral resource estimates is Marc-Antoine Laporte P.Geo., M.Sc., of SGS Group in Quebec, Canada. Mr. Laporte is a Qualified Person as defined by Canadian National Instrument 43-101.

The qualified person (QP) for the technical information contained herein is Mr. Alexandre Rodrigues Cabral, P. Eng., member of the Ordre des Ingenieurs du Quebec (OIQ, membership number 105796), who is considered, by virtue of his education, experience and professional association, a Qualified Person under the terms of NI 43-101. Mr. Cabral is not considered an independent QP under NI 43-101 as he is a Sigma Lithium Director and Chair of the Company’s

Technical Committee.

CAUTIONARY NOTE REGARDING

FORWARD-LOOKING INFORMATION

Certain information and statements in this

MD&A may constitute “forward-looking information” within the meaning of Canadian securities legislation and “forward-looking statements” within the meaning of U.S. securities legislation (collectively, “

Forward-Looking Information”), which involve known and unknown risks, uncertainties, and other factors which may cause the actual results, performance or achievements of the Company, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such Forward-Looking Information. All statements, other than statements of historical fact, may be Forward-Looking Information, including, but not limited to, mineral resource or mineral reserve estimates (which reflect a prediction of the mineralization that would be realized by development). When used in this MD&A, such statements generally use words such as “may”, “would”, “could”,

“will”, “intend”, “expect”, “believe”, “plan”, “anticipate”,

“estimate” and other similar terminology. These statements reflect management’s current expectations regarding future events and operating performance and speak only as of the date of this MD&A. Forward-Looking Information involves significant risks and uncertainties, should not be read as guarantees of future performance or results, and does not necessarily provide accurate indications of whether or not such results will be achieved. A number of factors could cause actual results to differ materially from the results discussed in the Forward-Looking Information, which is based upon what management believes are reasonable assumptions, and there can be no assurance that actual results will be consistent with the Forward-Looking Information.

In particular (but without limitation), this

MD&A contains Forward Looking Information with respect to the following matters: statements regarding anticipated decision making with respect to the Company; capital expenditure programs; estimates of mineral resources and mineral reserves; development of mineral resources and mineral reserves; government regulation of mining operations and treatment under governmental and taxation regimes; the future price of commodities, including lithium; the realization of mineral resource and mineral reserve estimates, including whether mineral resources will ever be developed into mineral reserves; the timing and amount of future production; currency exchange and interest rates; expected outcome and timing of environmental surveys and permit applications and other environmental matters; potential positive or negative implications of change in government; the Company’s ability to raise capital and obtain project financing; expected expenditures to be made by the Company on its properties; successful operations and the timing, cost, quantity, capacity and quality of production; capital costs, operating costs and sustaining capital requirements, including the cost of construction of the processing plant; and competitive conditions and the ongoing uncertainties and effects in respect of the military and global conflicts.

Forward-Looking Information does not take into account the effect of transactions or other items announced or occurring after the statements are made. Forward-Looking Information is based upon a number of expectations and assumptions and is subject to several risks and uncertainties, many of which are beyond the Company’s control, that could cause actual results to differ materially from those disclosed in or implied by such Forward-Looking Information.... (truncated)any has made assumptions regarding, among other things:

Although management believes that the assumptions and expectations reflected in such Forward-Looking Information are reasonable, there can be no assurance that these assumptions and expectations will prove to be correct. Since Forward-Looking Information inherently involves risks and uncertainties, undue reliance should not be placed on such information.

In addition, Forward Looking Information with respect to the potential outlook and future financial results contained in this MD&A is based on assumptions noted above and about future events, including economic conditions and proposed courses of action, based on management's assessment of the relevant information available as at the date of such information. Readers are cautioned that any such information should not be used for purposes other than for which it is disclosed.

The Company’s actual results could differ materially from those anticipated in any Forward-Looking Information as a result of various known and unknown risk factors, including

(but not limited to) the risk factors referred to under the heading “Financial Risk Factors” in this MD&A. Such risks relate to, but are not limited to, the following:

Readers are cautioned that the foregoing lists of assumptions and risks are not exhaustive. The Forward-Looking Information contained in this MD&A is expressly qualified by these cautionary statements. All Forward-Looking Information in this MD&A speaks as of the date of this MD&A. The

Company does not undertake any obligation to update or revise any Forward-Looking Information, whether as a result of new information, future events, or otherwise, except as required by applicable securities law. Additional information about these assumptions, risks, and uncertainties is contained in the Company’s filings with securities regulators, including this MD&A and the Annual Information

Form, which are available on SEDAR+ at www.sedarplus.ca.

CAUTIONARY

NOTE REGARDING MINERAL RESERVE & MINERAL RESOURCE ESTIMATE

Technical disclosure regarding the Company’s properties included in this document has not been prepared in accordance with the requirements of U.S. securities laws. Without limiting the foregoing, such technical disclosure uses terms that comply with reporting standards in Canada and estimates are made in accordance with NI 43-101. Unless otherwise indicated, all mineral reserve and mineral resource estimates contained in the technical disclosure have been prepared in accordance with NI 43-101 and the CIM Definition Standards.

NI 43-101 is a rule developed by the Canadian

Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. NI 43-101 differs significantly from the disclosure requirements of the SEC generally applicable to U.S. companies. Accordingly, information contained in this MD&A is not comparable to similar information made public by U.S. companies reporting pursuant to SEC disclosure requirements.
