MARA Holdings Q3 2026 earnings

MARA · 2026-11-09 16:05 AMC ET · 8-K on SEC

Adjusted EBITDA surged 117% YoY to $857.7M, and net income swung to $632.1M, driven by a $885.3M unrealized BTC gain, while revenue declined 35% due to lower BTC prices.

Headline numbers

MetricActualYoYQoQ8-K location
Revenue$164.2M-35%-6.1%Ex. 99.1, Highlights
EPS (GAAP)$1.28+373%+103%Ex. 99.1, Highlights
Net income$632.1M+413%+103%Ex. 99.1, Highlights

Revenue breakdown

not stated in the 8-K

Margins and costs

  • Gross margin N/A
  • Operating expenses $267.9M (+4.3% YoY)
  • One-offs in the quarter Change in fair value of digital assets: $421.9M gain; Change in fair value of derivative instrument: $19.0M gain; Litigation settlement: $10.2M; Early termination expenses: $5.0M; Restructuring costs: $19.0M; Acquisition and integration costs: $1.9M
  • Effective tax rate 0.16% (prior-year 23.5%, year-to-date 2.5%)
  • Non-GAAP bridge Adds back stock-based compensation ($28.4M), change in fair value of derivative instrument ($19.0M), impairment of goodwill and other assets, restructuring costs ($19.0M), acquisition and integration costs ($1.9M), litigation settlement ($10.2M), net gain from extinguishment of debt, and net gain on investments. Includes BTC loaned, actively managed or pledged as collateral.

KPIs

MetricActualPrior quarterPrior yearChange
Energized hashrate71.2 EH/s70.3 EH/s60.4 EH/s+18% YoY, +1.3% QoQ
BTC held34,012 BTC35,577 BTCN/A-4.4% QoQ
BTC produced2,247 BTC2,422 BTC2,144 BTC+5% YoY, -7.2% QoQ
Purchased energy cost per BTC$39,674$38,690$39,235+1.2% YoY, +2.5% QoQ
Cost per petahash per day$30.8$27.7$31.3-2% YoY, +11% QoQ

Guidance

not stated in the 8-K

What drove it

  • Revenue story Revenue decreased $88.2M (35%) YoY driven by a $94.8M decline from a 37% lower BTC price, partially offset by $11.7M from higher production.
  • EPS story Net income increased $508.9M YoY driven by an $885.3M unrealized BTC mark-to-market gain vs $343.1M gain in Q3 2025.
  • One-off check Change in fair value of digital assets: $421.9M gain (vs $234.2M loss in Q3 2025).

The good

  • Adjusted EBITDA increased 117% YoY to $857.7M
  • Net income swung to $632.1M from a loss in Q3 2025
  • Cost per petahash per day improved 2% YoY to $30.8
  • Cost per kWh remained flat at $0.04 for owned sites

The bad

  • Revenue declined 35% YoY to $164.2M
  • Purchased energy cost per BTC increased 1.2% YoY to $39,674
  • Third-party hosting and other energy costs decreased 4.2% YoY to $71.5M

The ugly

  • none

Open questions

  • The release does not provide a specific revenue or earnings outlook for Q4 2026.
  • The release does not disclose the specific terms or pricing of the Exaion GPU-as-a-service contract beyond the $79M four-year value.
  • The release does not disclose the specific terms of the $500M share repurchase authorization.
Full release

MARA Holdings (MARA) earnings release, November 9, 2026

MARA Holdings, Inc. (MARA) · Form 8-K, Item 2.02 · Filed · SEC filing

SHAREHOLDER LETTER

Q3

2026³

Bitcoin built the foundation. Power created the opportunity. Our strategy now is simple: maximize the value of every megawatt ("MW") we control.

In Q3 2026, we started transforming the platform we have assembled into a business designed to produce durable, contracted returns. Over the past several years, MARA has built a difficult-to-replicate portfolio of powered assets, operating infrastructure, and technical capability. Our priority now is to convert those advantages into signed customer agreements, completed projects, and durable free cash flow.

The Quarter: Progress on Many Fronts

A lease does not start with a signature. It starts with power, a buildable site, a capable partner, and a financeable customer.

This quarter, we advanced each of those pieces.

• Sites and development:

Since the end of last quarter, we have made great progress and our discussions with tenants are in advanced stages. Our engineering and operations teams have hosted prospective tenants across nearly all of our sites and we feel particularly proud of the development team's progress at Kearney, where pre- development is well advanced. While we are targeting signing two leases before year-end, market conditions are fluid and that timing could slip into next year. We will continue to advance the power, permitting, site, and financing work required to support these agreements and look forward to updating the market as we have news to share.

• Power:

At Long Ridge, we recently received FERC approval, and we expect to close the transaction in the coming weeks, subject to customary conditions. We are excited to add a highly efficient natural gas plant to our portfolio that is currently authorized to sell

485

MW and expected to increase to the full

505

MW nameplate capacity in the first half of 2027. Long Ridge will not only immediately strengthen our financial profile with contracted cash flows from power generation but also provides us over

1,600 contiguous acres with access to power, water, fiber, and rail, supporting a premier data center campus. Together with our existing Bitcoin mining operations at the site, we will have over 1 GW of total potential capacity. We look forward to completing the transaction and beginning the next phase of Long Ridge’s development as part of our strategy to expand into data center infrastructure. In addition, we advanced our power portfolio by securing the rights to develop a site in

Matagorda County, Texas with up to 2 gigawatts ("GW") of power capacity. The site was recently classified as a studied load by ERCOT in the Batch Zero process and we are working with the utility to bring power online. Any payments to the sellers are contingent on power being approved and, to date, we have made none.

• Exaion signed a four-year $79M GPU-as-a-service contract on 100% take-or-pay terms with its first US customer. Customer demand has built a pipeline of over $3 billion in total contract value, with approximately $1 billion of that targeted for delivery by the end of 2027. These are indications of demand and are not yet contracted or committed.

• After quarter-end, our

Board of Directors authorized a share repurchase program of up to

$500M of our common stock, which reflects the Board’s and management’s confidence in our long-term strategy and gives us an additional tool to enhance shareholder returns. In the current environment, we are always looking to deploy our capital where it can earn the highest and best return, and at times that may mean repurchasing our shares. While markets have declined, bitcoin has remained resilient, and our balance sheet gives us the flexibility to act on those opportunities when they arise. We intend to use it deliberately, in the way that creates the most advantage for our

SHAREHOLDER LETTER

Q3

2026⁴ shareholders. We have spent years building a differentiated portfolio spanning power, land and compute, and we remain focused on turning that foundation into contracted returns and durable free cash flow. We will stay disciplined in how we allocate capital, deploying it where we believe it can create the greatest value for you.

Under the program, we may repurchase shares from time to time through open market purchases, privately negotiated transactions or other means in accordance with SEC regulations. The timing and amount of any repurchases will depend on market conditions, share price, capital availability and other factors, and the program does not obligate us to repurchase any particular amount and may be modified, suspended or terminated at any time.

• After quarter-end, we repaid

$750M of BTC-backed debt with proceeds from Bitcoin sales.

The repayment released all BTC that had been pledged as collateral, leaving less than 5% of our BTC holdings loaned or pledged.

Together with the

$1.4 billion, or

37% of total debt reduced since the beginning of the year, this repayment decreased our exposure to bitcoin price volatility. We intend to continue using bitcoin to build cash for purposes such as AI infrastructure opportunities, to satisfy the puts on our convertible notes that become exercisable next year, and potential share repurchases.

To put these milestones in context, it helps to start with the market in which we are building.

The Market

Investor sentiment toward AI infrastructure has become more cautious as the market assesses the pace of AI adoption, community opposition, higher financing costs, and the credit structures behind some projects. These issues matter, but they have not reduced the need for power.... (truncated)ower on a credible schedule. Customers are also asking about capacity in locations once considered peripheral, including our international portfolio.

What has changed is that the market is applying a higher standard. Customers need power, land, permits, financing, and a development partner who can meet a committed schedule. Lenders and investors are applying the same test.

That environment favors MARA.

MARA built our platform around these requirements. Bitcoin mining gave us deep expertise in power, infrastructure and large-scale compute, and it is where we cut our teeth acquiring powered land. Today, we own and operate approximately

1 GW across a diversified portfolio of sites in the US and international markets. Subject to the closing of Long Ridge and energization of Matagorda, we expect that portfolio to reach over 4 GW.

As AI and HPC demand grows, power-ready infrastructure has become the critical constraint. New generation and transmission take years to build, and permitting and community opposition can stretch the timeline further. Customers are paying a premium for sites that are already energized or have a credible path to near-term power. That makes what MARA has built significantly more valuable.

That shift has shaped how we are evolving the business.

Where We Are Now

We are evolving into an energy-backed digital infrastructure enterprise spanning power, land, and compute.

It is important to remember that this is not a pivot away from bitcoin. Bitcoin remains our operating foundation and a flexible way to monetize power while we develop higher-value infrastructure opportunities. Our strategic advantage is optionality: we can deploy each megawatt toward the use that creates the greatest risk-adjusted return.

SHAREHOLDER LETTER

Q3

2026⁵

We see three transformational paths to value:

• Bitcoin mining remains a core business. It generates cash flow, keeps energized sites productive, and gives us flexibility as other infrastructure is developed.

• AI and HPC infrastructure put our proposition of Speed, Certainty and Reliability into practice, converting powered land into long-duration, contracted infrastructure for hyperscalers and other large compute customers.

• Exaion provides private cloud infrastructure, inference and GPU-as-a-service, enabling MARA to capture the full value stack all the way up to the enterprise customer, maximizing the value of every electron while moving up the value and margin curve.

Why MARA is Positioned to Win

Three advantages set MARA apart.

We have the power and the ability to scale.

Once we complete the first phase of a campus, most of the hard work on land, interconnection, permitting, and campus infrastructure is behind us. A customer that begins with 200 MW may ultimately want 400 MW, 600 MW or more, and we increase the value of the site without starting over somewhere else.

Large campuses can also host a mix of customers (hyperscalers, AI cloud providers and direct enterprise workloads), which improves utilization and economics.

We can serve the full range of customers.

MARA plus Exaion gives us capabilities across the full compute stack, from powered infrastructure and traditional colocation to private cloud and AI services. We can lease infrastructure to a hyperscaler at a lower yield on cost or accept more risk for a higher return with frontier model providers and others. We are open to new technology solutions that help our customers. And Exaion gives us a footprint and leverage in Europe and

Canada, where it can be harder for a U.S. company to go directly.

We watched as aggressive pricing, rising rates, and uncertain delivery schedules eroded project economics for others.

That experience reinforced our decision to prioritize contracts that can be financed and delivered at acceptable returns. In our experience, waiting has improved the terms available to us.

SHAREHOLDER LETTER

Q3

2026⁶

Subject to closing, required approvals and customary conditions. Descriptions are forward-looking and may change.

Exaion

Our future business model already has traction, and it integrates the entire MARA enterprise stack. As we build out our digital infrastructure platform, Exaion gives us the opportunity to capture a greater share of the value chain, from providing power and infrastructure to providing the compute and cloud services that run on top of it.

Over time, that creates the potential for MARA to participate in higher-margin AI compute services, enhancing the margin per megawatt while leveraging the same underlying power and infrastructure assets at the foundation of our strategy.

Exaion takes MARA above the infrastructure layer. It provides private cloud infrastructure, open-weight model orchestration, and inference as a service for customers who need greater control over their data, infrastructure, and jurisdiction. Those needs are especially important for governments, regulated industries and enterprises in Europe, and other markets where sovereignty and security shape technology decisions.

Exaion also lets us share in the value created by the compute itself. Its operating model can utilize GPUs across their lifecycle, extending their utility and cash flow well beyond initial contract durations. That improves utilization and returns across the life of the asset.

This is no longer simply a future-state thesis. We now have an early proof point with Exaion recently signing a major GPU- as-a-service contract with total contract value of $79 million over four years, on 100% take-or-pay terms. The customer commits to pay for the capacity whether or not it uses it, which gives us predictable, contracted revenue for the life of the agreement.... (truncated)gnal of demand. Exaion’s customers and prospects have expressed demand for more than 30

MW of compute capacity for delivery by the end of 2027. We view this contract as an early proof point of the model we are building: MARA provides the energy-backed infrastructure, and Exaion turns it into compute and cloud services.

This is how we intend to move up the value chain: not by trying to own every layer on our own, but through strategic partnerships. That gives us a unique, differentiating right to win.

Bitcoin Mining

All of this rests on the business that built MARA, which remains core to our strategy.

SHAREHOLDER LETTER

Q3

2026⁷

The competencies it takes to run a large mining fleet (power procurement, modular deployment, infrastructure optimization and real-time load management) are the same competencies that digital infrastructure tenants require.

Modular deployment is a good example. It lets us bring capacity online faster than a traditional build and at lower cost, which matters to customers who need compute up and running quickly. We believe MARA is one of the largest operators of modular Bitcoin mining digital infrastructure in the United States, and we intend to apply that experience as we transition towards AI/HPC.

We continue to modernize the fleet where the gain in efficiency and the expected payback justify the investment. When equipment pricing is weak, we have been selective, acquiring machines that raise output without increasing total mining power consumption. We weigh each of these investments against the timing of the next halving and the payback over the full cycle.

Our objective is to increase computing output within the existing electrical footprint, and to preserve the option to direct power to the use that offers the best risk-adjusted return. At some sites, that will remain Bitcoin mining. At others, contracted AI/HPC infrastructure may be the better long-term use. We do not have to choose one or the other.

Vertebrai

We recently launched Vertebrai, MARA's flexible computing platform built on nearly a decade of running power-intensive computing across energy markets. Power and demand rarely arrive at the same time, and Vertebrai's software decides, moment to moment, where power should go. It absorbs power that would otherwise sit idle or sell at a loss, then scales back when the grid needs that power elsewhere.

Based on the site's settlement data, April 1 to September 30, 2026. Percentages are shares of potential generation. "Without Vertebrai" assumes all potential generation during economic curtailment periods, mostly hours when real-time prices were negative, would have been curtailed. Vertebrai's on-site computing used 53% of that energy.

We proved it first at our own wind farm in Hansford County, Texas. From April through September 2026, we estimate that

Vertebrai helped our Texas wind farm cut curtailment by more than half. Without Vertebrai, an estimated 46% of potential wind generation would have been curtailed. By using on-site computing to absorb power that otherwise would have gone unused, Vertebrai reduced that figure to 22%, putting more of the farm’s generation to productive use and creating an additional source of revenue.

SHAREHOLDER LETTER

Q3

2026⁸

We now see a similar opportunity with data center developers, who often secure power 18 to 24 months before their facilities can use it while paying for a minimum share of it regardless. With Vertebrai now live, we are focused on bringing this model to additional power producers and data center developers.

Balance Sheet and Capital Allocation

Each of these priorities depends on a strong balance sheet.

Our balance sheet has to support the obligations we have today and the opportunities we are building for tomorrow. So we manage cash, bitcoin, debt, and access to capital as parts of one balance sheet. Since the beginning of the year, we have reduced our total debt by

$1.4 billion, or

37%.

We view bitcoin as a strategic asset and a source of financial flexibility. Depending on market conditions and the expected return on the use of proceeds, we may hold it, monetize a portion, or borrow against it. That capital can support operations, reduce debt, fund acquisitions, or advance projects we believe will increase long-term shareholder value. We used this flexibility earlier in the year to repurchase convertible notes at a discount, and we continue to monitor the put dates on our remaining obligations.

We will keep balancing growth against leverage and dilution. The Starwood model reduces the corporate equity required for qualifying data center projects, and our bitcoin holdings and other sources of liquidity add capacity. We expect our direct spending to stay focused on site control, interconnection, development work, targeted infrastructure upgrades, and selected project equity where the prospective return warrants it.

The capital markets remain open for well-structured developments. We price each project to reflect the customer’s credit, the support available from a parent or technology provider, and the financing needed to build the facility.

Looking Ahead

The next stage will be measured by execution. Demand for compute capacity remains strong, but the market is becoming more selective about how that demand is financed and delivered. We believe that selectivity is constructive. It should favor companies with real power, credible sites, strong partners, and the patience to structure projects properly. MARA has spent years building exactly that.

When we think about MARA’s future, the opportunity is bigger than monetizing the megawatt. It is about increasing the... (truncated) to infrastructure to compute, and ultimately to fully integrated cloud solutions.

We entered 2026 focused on expanding the platform. We are ending the year focused on converting that platform into contracted leases and free cash flow. Bitcoin built the foundation and our power portfolio broadened the opportunity. Our partnerships expand the ways we can capture value from each megawatt. Our responsibility now is to execute with discipline and to show you the returns these assets can produce.

Thank you for your continued support.

MARA Chairman & CEO

SHAREHOLDER LETTER

Q3

2026⁹

Highlights – O ur energized hashrate was

71.2

EH/s, increasing

18% from

60.4

EH/s as of

Q3

2025. – Revenue was

$164.2 million, a decrease of

35% from

$252.4 million in

Q3

2025. – W e held

34,012

BTC (including digital assets - receivable, net) and produced

2,247

BTC at an average price of

$71,688. We sold

3,891

BTC at an average price of

$75,300. – Total blocks won increased

2% to

644 from

633 in

Q3

2025. – Our cost per kWh was

$0.04 for our owned sites.

Purchased energy cost per bitcoin was

$39,674, slightly up from

$39,235 in

Q3

2025. – Cost per petahash per day improve d

2% to

$30.8 from

$31.3 in

Q3 2025. – Net income was

$632.1 million, or

$1.28 per diluted share, compared to

$123.1 million, or

$0.27 per diluted share, in

Q3

2025. Net income during the quarter includes an

$885.3 million gain related to the fair value of digital assets. – Adjusted EBITDA was

$857.7 million, compared to

$395.6 million in

Q3

2025. – $3.8 billion of combined unrestricted cash and cash equivalents and BTC (including bitcoin loaned or pledged as collateral) – Loaned

1,408

BTC under our digital asset management strategy, generating approximately

$2.5 million of interest income for the quarter. – We advanced our power portfolio by securing the rights to develop a Matagorda County, Texas site with up to 2 GW, structured so that payments follow regulatory approvals and development progress. The site was classified as a studied load by ERCOT in the Batch Zero process. After quarter- end, we obtained a

$100.0 million letter of credit for the interconnection study deposit. – After quarter-end, we received FERC approval for our Long Ridge acquisition, which we expect to close by year end. Once completed, Long Ridge is expected to generate significant adjusted EBITDA, with roughly 70% of its output under long-term contracts. – After quarter-end, w e sold

13,597 bitcoin around

$81,039, with proceeds of approximately

$1.1 billion.

We used

$750.0 million to fully repay our Bitcoin- collateralized term loans. The repayment resulted in the return of

17,477 bitcoin previously pledged as collateral. – Year to date, we deleveraged our balance sheet by reducing

$1.4 billion, or

37% of total debt. – After quarter

-end, our Board authorized MARA’s share repurchase program of up to

$500.0 million, reflecting confidence in our long-term strategy and adding a tool to enhance shareholder returns.

Third Quarter

Production Highlights

1.

Defined as the total amount of block rewards including transaction fees that MARA earned during the period divided by the total amount of block rewards and transaction fees awarded by the Bitcoin network during the period.

2.

Defined as the amount of hashrate that could theoretically be generated if all miners that have been energized are currently in operation including miners that may be temporarily offline.

Hashrates are estimates based on the manufacturers’ specifications. All figures are rounded.

SHAREHOLDER LETTER

Q3

2026¹⁰

REVENUE

Revenue was

$164.2 million, a decrease of

$88.2 million, or approximately

35%, from

$252.4 million in the prior year period. Bitcoin mining revenue accounted for

$83.1 million of the decrease. A

37% decline in the average price of bitcoin mined lowered revenue by

$94.8 million, partially offset by an

$11.7 million benefit from higher bitcoin production.

We produced an average of

24.4

BTC per day, up from

23.3

BTC in

Q3 2025, resulting in

2,247

BTC mined compared to

2,144 or

5% more

BTC mined year-over-year. Blocks won also increase d

2% over the same period.

*Average Price of BTC over the quarter

NET

INCOME

We reported net income of

$632.1 million, or

$1.28 per diluted share, compared to net income of

$123.1 million, or

$0.27 per diluted share, in the third quarter of

2025.

The

$508.9 million increase in net income was primarily driven by an

$885.3 million unrealized bitcoin mark-to-market gain in

Q3

2026, compared to a

$343.1 million gain in the prior year period, representing approximately

$542.2 million year-over-year change, reflecting a

27% improvement in BTC price during the quarter.

This chart illustrates the close relationship between the mark-to- market impact on the company's bitcoin holdings relative to its reported net income

(loss).

SHAREHOLDER LETTER

Q3

2026¹¹

PURCHASED ENERGY COSTS

We define purchased energy costs as the amount paid to power providers for power consumed related to our owned Bitcoin mining operations. Our purchased energy costs were

$48.1 million, compared to

$43.1 million in the prior year period. The

12% increase was primarily driven by the growth of our owned mining operations through a site acquisition during the year and increased utilization of capacity at our newest Central Nebraska and... (truncathio sites, partially offset primarily by weather-related downtime at certain sites.

Total energized hashrate increased

18% to

71.2

EH/s from

60.4

EH/s in

Q3

2025, primarily through improvements in miner efficiency.

Our owned sites maintained a cost per kWh of

$0.04.

Purchased energy cost per bitcoin for our owned and operated sites was

$39,674, compared to

$39,235 in

Q3

2025, primarily driven by higher power costs and global network difficulty outpacing our hashrate growth.

OPERATING AND MAINTENANCE COSTS

Operating and maintenance costs were

$21.5 million compared to

$26.3 million in the prior year period, a decrease of

$4.8 million. The decrease was primarily due to realized gains from energy derivative contracts and lower shipping costs, partially offset by higher site and miner repair and maintenance costs.

THIRD-PARTY HOSTING AND OTHER

ENERGY COSTS

Third-party hosting and other energy costs primarily consist of colocation services related to third-party hosted sites. Third-party hosting and other energy costs were

$71.5 million, compared to

$75.7 million in

Q3

2025, a

$4.2 million decrease driven by lower hosting costs, partially offset by higher energy consumption at certain third-party hosted sites.

Our most significant third-party hosting arrangements, representing approximately

29% of our total energy capacity, are scheduled to expire, beginning in the third quarter of 2027 and expected to fully conclude during the first quarter of 2028. These expirations are expected to eliminate third-party hosting costs and improve our cost per kWh over time as the arrangements expire.

COST PER PETAHASH

Our cost per petahash per day improve d

2% to

$30.8 from

$31.3 in

Q3

2025, and has improved

20% over the past eight quarters.

GENERAL AND ADMINISTRATIVE

General and administrative ("G&A") expenses were

$75.8 million compared to

$85.3 million in the p rior year period. The

$9.5 million or

11% decrease primarily reflects a

$9.8 million reduction in stock-based compensation expense.

This was partially offset by G&A

SHAREHOLDER LETTER

Q3

2026¹² expenses from the operating costs of our recently acquired majority-owned subsidiary,

Exaion, and administrative costs supporting our expanded footprint.

DEPRECIATION AND AMORTIZATION

Depreciation and amortization was

$150.9 million, a

$16.5 million decrease compared to the prior year period. The

10% decrease was driven by lower depreciation as certain mining rigs reached the end of their useful lives.

ADJUSTED EBITDA

Adjusted EBITDA increased to

$857.7 million,

*including BTC loaned, actively managed or pledged as collateral up

117%, from

$395.6 million compared to

Q3

2025. The increase was primarily driven by a mark-to-market change in the fair value of digital assets, primarily reflecting a larger increase in bitcoin prices during the quarter

Financial statements

Income Statement

Three Months Ended September 30, — (unaudited) (in thousands, except share and per share data)

Three Months Ended September 30, – 2026Three Months Ended September 30, – 2025Nine Months Ended September 30, – 2026Nine Months Ended September 30, – 2025
Revenues164,233252,410513,728704,779
Costs and operating expenses (income)
Purchased energy costs48,12443,080141,606128,291
Operating and maintenance costs21,48126,31079,01868,466
Third-party hosting and other energy costs71,51175,664210,715212,876
General and administrative75,81585,296277,373264,109
Depreciation and amortization150,851167,312517,071486,950
Change in fair value of digital assets-421,853-234,240542,383-686,105
Change in fair value of derivative instrument18,9524,42261,766-42,717
Impairment of goodwill and other assets26,253
Taxes other than on income1,3332,3545,2847,886
Early termination expenses5,0005,000
Research and development2,4958,71617,91626,560
Restructuring costs18,97920,90566,61720,905
Total costs and operating expenses (income)-12,312204,8191,919,749518,474
Operating income (loss)176,54547,591-1,406,021186,305
Other income
Change in fair value of digital assets - receivable, net463,478108,85966,110339,339
Net gain from extinguishment of debt1,02970,5571,029
Interest income9,26817,68930,06339,315
Interest expense-13,472-12,760-30,456-35,536
Equity in net earnings of unconsolidated affiliate-2,822-1,711-7,849-2,626
Other-1,9311154,596-2,920
Total other income454,521113,221133,021338,601
Income (loss) before income taxes631,066160,812-1,273,000524,906
Income tax benefit (expense)1,005-37,67831,357-127,010
Net income (loss)632,071123,134-1,241,643397,896
Less: net (income) loss attributable to noncontrolling interest, including redeemable noncontrolling interest2,286-66,696268
Net income (loss) attributable to common stockholders634,357123,128-1,234,947398,164
Net income (loss) per share of common stock - basic1.640.33-3.231.13
Weighted average shares of common stock - basic385,698,449372,073,173382,494,083352,315,857
Net income (loss) per share of common stock - diluted1.280.27-3.230.9
Weighted average shares of common stock - diluted496,385,479470,126,290382,494,083450,081,096

Income Statement

Three Months Ended September 30, — 2026 (in thousands)

Three Months Ended September 30, – 2026Three Months Ended September 30, – 2025Nine Months Ended September 30, – 2026Nine Months Ended September 30, – 2025
Reconciliation to Adjusted EBITDA:
Net income (loss) attributable to common stockholders634,357123,128-1,234,947398,164
Net income (loss) attributable to noncontrolling interests-2,2866-6,696-268
Net income (loss)632,071123,134-1,241,643397,896
Interest expense (income), net4,204-4,929393-3,779
Income tax expense (benefit)-1,00537,678-31,357127,010
Depreciation and amortization154,068170,521526,759496,437
EBITDA789,338326,404-745,8481,017,564
Stock-based compensation expense28,44638,466105,635142,237
Change in fair value of derivative instrument18,9524,42261,766-42,717
Impairment of goodwill and other assets26,253
Restructuring costs18,97920,90566,61720,905
Acquisition and integration costs1,9441,47528,4071,475
Litigation settlement10,200
Net gain from extinguishment of debt-1,029-70,557-1,029
Net gain on investments-12,429
Early termination expenses5,0005,000
Adjusted EBITDA (1)857,659395,643-543,7801,157,259

From SEC EDGAR. Analysis by Pear Digitals from the filing alone. Not investment advice. · MARA Holdings earnings · Latest earnings · Markdown

Screener

Plans

Premium and Pro coming soon.

Log in

New here?

Join the waitlist

Pear FMV opens to everyone soon. We'll email you when it does.