MARA Holdings earnings release, May 11, 2026
SHAREHOLDER LETTER
Q1
2026³
Q1 2026 was a redefining quarter for MARA.
We advanced the Starwood strategic partnership from announcement to execution, closed our acquisition of a majority interest in Exaion, retired approximately
30% of our outstanding convertible debt, realigned the organization, and, after quarter end, announced a definitive agreement to acquire
Long Ridge Energy & Power ("Long Ridge") from FTAI Infrastructure Inc. (NASDAQ: FIP).
Together, these actions accelerate MARA's evolution into a leading digital infrastructure company built to convert energy into high-value compute across AI, HPC, and critical IT loads, and Bitcoin mining. We believe the next phase of digital infrastructure value creation will be shaped by control of power: where it is located, when it is available, and how it can be best monetized.
AI adoption is accelerating faster than power can be brought on to meet demand. As a result, we believe available connected energy is the constraint to AI compute growth and availability. The ability to source, control, and dynamically allocate connected power is a strategic advantage, and MARA is positioned to meet the demand.
Long Ridge: Building A Premier Data Center Campus
After quarter end, we announced a definitive agreement to acquire Long Ridge. We view Long Ridge as a strategic extension of our existing Hannibal operations – adding land and power that provides all the key ingredients for a premier data center campus – and not as a utility investment. Long Ridge wraps around our existing operations and combines powered land, owned generation, interconnection, and near-term cash flow in a way that can unlock meaningful AI and critical IT load capacity over time. As part of the transaction, we plan to retain Long Ridge's existing team, supplementing our expertise and providing a scalable operating platform for future growth.
At the core of our strategy is a simple idea: power is the most important input, and we want to deploy it across the highest-value applications. That includes AI and high-performance computing, critical IT infrastructure, and flexible compute, including Bitcoin mining. Power is at the core of that model – owned, operated, behind-the-meter and grid-connected – and our objective is to dynamically allocate that power to maximize returns over time.
We believe Long Ridge will unlock what we have been building toward. Upon closing, it will establish a leading AI data center campus in the PJM Interconnection, one of the most active data center and power markets in North America, anchored by our existing footprint at Hannibal. And on top of that, we are acquiring a power plant. The 485 MW nameplate (expected to increase to 505 MW nameplate capacity in H2 2026) combined-cycle gas turbine is one of the most efficient combined-cycle gas
SHAREHOLDER LETTER
Q1
2026⁴ turbines in the PJM interconnection, delivering contracted cash flows on ~76% hedged capacity. This is not a development bet. It is a current operating asset generating stable, visible cash flow from day one, with the opportunity to grow generation capacity over time.
The site sits on 1,600 acres of flat, contiguous land. The power is there. The land is there. The water is there. The fuel supply is there. And the interconnection is there. Assets of this scale and quality are increasingly difficult to replicate given the time, cost, and complexity required to secure power, land, permitting, and interconnection in today's market. We are acquiring assets that would take up to 10 years to assemble on our own.
Our existing Bitcoin mining operations at Hannibal continue without interruption as we work through the process of securing investment-grade, or shadow investment-grade, tenants, several of whom have already expressed inbound interest. We do not need to choose between our businesses. Taken together, we believe Long Ridge will give MARA a scaled, power-advantaged platform, immediate and durable cash flow upon closing, and a clear path to build one of the leading digital infrastructure campuses in the market.
We expect Long Ridge will continue to supply power to the grid and generate cash flow and positive
EBITDA upon closing. Our intention is to develop incremental capacity at the site and build a higher- value digital infrastructure asset. The low-cost power plant is not the end product. It is the enabler that makes the campus more reliable, more differentiated, and more valuable. This is the essence of our vertical integration strategy: controlling low-cost power and infrastructure so we can compete more effectively as cost per token becomes an increasingly important factor for AI workloads.
Long Ridge brings together several sources of value:
• 1,600 contiguous acres of powered land and premier AI campus potential:
This vertically-integrated operational site combines owned generation, fuel integration, existing
PJM interconnection, and operates at less than $0.015/kWh all-in, a low-cost position that few can match. These attributes are scarce and difficult to replicate.
• Co-located Bitcoin mining:
MARA's existing 200 MW Bitcoin mining operation sits on the same site, generates cash flow, and provides workload optionality as we develop the broader campus.
• Power generation with existing cash flow:
The combined-cycle gas turbine plant has a 505
MW nameplate capacity, with 485 MW currently authorized for sale and an expected increase to the full 505 MW in 2H 2026. The plant operates at a high-capacity factor, has produced positive EBITDA and maintains contracted cash flow.
• Scalable platform:
The site gives us over 1 GW of total potential capacity and the ability to... (truncated) and critical IT load over time, supported by a combination of grid expansions and on-site power generation.
SHAREHOLDER LETTER
Q1
2026⁵
We are engaged in active tenant discussions for Long Ridge and believe the site is well positioned for hyperscaler and enterprise customers whose infrastructure timelines are increasingly constrained by access to power. Subject to closing and tenant execution, we believe Long Ridge can support tenant commitments soon after closing, which we expect to occur in the second half of the year, subject to regulatory approvals, including clearance under the Hart-Scott-Rodino Act and Federal Energy
Regulatory Commission approval, as well as satisfaction of other customary closing conditions.
Starwood Strategic Partnership: Progress, Pipeline, and Economics
Our strategic partnership with Starwood to jointly develop, finance, and operate next generation digital infrastructure made meaningful progress during the quarter as we moved from announcement to execution. We are advancing permitting and site preparations across our portfolio and are engaged in active discussions with multiple potential tenants, including major hyperscalers. Currently, approximately 90% of our non-hosted capacity is being considered for site conversion for AI and critical IT compute. Our focus is on developing infrastructure capable of generating durable, contracted revenue from scarce, high-value energy assets.
We are also actively pursuing a pipeline of powered land and infrastructure opportunities that can fit into the same model. Our expectation is to sign one or more tenant leases by year-end, and we intend to disclose the number of megawatts under contract as the pipeline converts into signed commitments.
The partnership is designed to unlock the value embedded in MARA's power and land portfolio while limiting the incremental capital required from our balance sheet.
In contrast to a traditional lease, the JV structure gives MARA several built-in advantages:
1.
Starwood as a trusted counterparty:
Starwood brings more than 30 years of global investment expertise and a dedicated data center development platform, with experience across more than 7 GW of data center capacity worldwide.
2.
Captive EPC partner:
Starwood leads design, development, construction, and facility operations, giving MARA a proven and experienced development partner without needing to source or manage third-party contractors.
3.
Capital efficient for MARA:
When MARA contributes a site to a joint venture, that contribution is valued using pre-agreed, site-specific economics tied to the site's power, land, interconnection, and development attributes. That value gives MARA equity credit in the project before new cash is required.
In addition to capital, Starwood contributes its development capabilities, including hyperscaler leasing experience, in-house EPC expertise, construction oversight, and institutional discipline around tenant and project risk. This structure allows MARA to retain meaningful ownership in large-scale AI infrastructure projects while partnering with an experienced developer of complex real estate and
SHAREHOLDER LETTER
Q1
2026⁶ infrastructure assets. The result is a more capital-efficient path to value creation than MARA would likely achieve by developing these assets alone.
Hypothetical 200 MW site example
A hypothetical example illustrates the potential economics under the strategic partnership:
• MARA contributes a 200 MW site at an agreed value, resulting in a site contribution value of
$200 million.
• The project incurs pre-construction and site-readiness costs, such as power deposits, land- related costs, fiber upgrades, and other investments needed to make the site leasable for a tenant.
• Because MARA's site contribution is recognized upfront as equity, MARA's cash requirements are deferred until its site contribution has been fully credited against the project's capital needs. From there, MARA's ownership stake is proportional to its total contribution relative to the project's capital requirements. In the illustrative 200 MW project, MARA could achieve 50% ownership with up to $50-100 million of net annualized stabilized cash flow (based on a range of 9-15% yield on cost) for little to no incremental equity exposure beyond its site contribution.
• As projects become larger, MARA’s contribution value is fixed and therefore the capital exposure for the growth is more proportional between each counterparty. This would reflect more traditional data center build capital requirements, which also utilize ~80% LTV construction financing.
The chart below illustrates the relative value of powered site acquisitions on a $/gross kW basis,
This is the economic power of the strategic partnership. MARA can convert the embedded value of its power portfolio into ownership in scaled AI infrastructure assets without bearing the full development cost, construction burden, or execution risk on its own.
SHAREHOLDER LETTER
Q1
2026⁷
Importantly, the Starwood model is not intended to be a one-time transaction. As we continue to aggregate land and power assets, our goal is to place appropriate assets into this JV structure so
MARA can pursue large-scale digital infrastructure value creation in a capital-efficient manner.
Exaion: A Private Cloud Pathway and International Growth Platform
While the Starwood joint venture addresses the large-scale, hyperscale end of the AI infrastructure market, Exaion addresses a different but complementary segment: sovereign, enterprise, and private-... (truncapute. Together, they give MARA two pathways into AI, both grounded in the same foundation of energy-backed infrastructure and both serving real and growing demand.
Governments and enterprises are increasingly prioritizing local control over compute, data residency, security, and trusted AI infrastructure, particularly across Europe and Canada. This is not a niche requirement. As AI policy evolves and data sovereignty standards tighten, more AI workloads will require infrastructure that is jurisdictionally controlled, compliance-ready, and independent of hyperscale-only platforms. We believe Exaion is positioned to serve that demand.
Exaion also gives MARA a platform to develop capacity internationally as market demand grows.
While we are still early in this effort and expect to provide more detailed pipeline and roadmap information in the future, Exaion is directly aligned with our broader vision.
The Starwood joint venture and Exaion are different expressions of the same thesis. The JV pursues large-scale colocation and digital infrastructure for hyperscalers. Exaion pursues private cloud, sovereign AI, and enterprise deployments in regulated markets. Both depend on MARA's core capability: controlling and monetizing energy-backed infrastructure. Together, they expand our addressable opportunity across two large and growing segments of the AI infrastructure market.
Exaion is part of our broader international strategy to position MARA as a power-advantaged digital infrastructure platform beyond the United States. Building on our proven success in the UAE, Finland and our recent launch in Oman, we are continuing discussions with international partners to develop data center campuses outside of the United States, including with major energy companies in France,
Brazil, and Saudi Arabia, across energy-rich regions where access to reliable, scalable power supports long-term infrastructure development.
Bitcoin Mining: Core Business Update
Bitcoin mining is not a legacy business we are moving away from. It is the operational foundation on which we are building. Our strategy centers on co-locating new infrastructure with existing Bitcoin mining operations, allowing us to monetize power assets immediately while leveraging the operational discipline and infrastructure expertise that mining provides. This approach creates flexibility: we can generate revenue today through Bitcoin mining while preserving the option to redirect power toward
AI and critical IT loads as those opportunities mature on the same sites.
SHAREHOLDER LETTER
Q1
2026⁸
We continue to believe the broader bitcoin market is supported by institutional demand, while retail participation remains comparatively subdued. In our view, that creates a constructive setup over time, with a bias to the upside if institutional buying continues and retail demand returns.
During the quarter, we acquired 2.4 EH of next-generation used ASIC miners at prices equivalent to a full replacement. This allowed us to improve fleet efficiency in a capital-disciplined manner, upgrading compute capacity without paying the full cost of new hardware. Going forward, we do not expect to pursue large-scale ASIC purchases. Our approach will remain selective, targeted, and grounded in clear economic return.
Looking Ahead
The actions we have taken so far this year were purposeful and interconnected. The Starwood joint venture creates a capital-efficient path to convert our power portfolio into AI infrastructure ownership.
We expect Long Ridge will add a differentiated land and power platform for an AI and critical IT compute campus that builds around our existing Hannibal operations. Exaion gives us a second AI pathway into sovereign and private cloud enterprise markets. Balance sheet actions reduced potential dilution and increased financial flexibility. And Bitcoin mining continues to be our foundation, providing the operational basis for the broader platform.
We recognize that MARA's evolution requires disciplined execution, thoughtful capital allocation, and continued investor engagement as the company moves beyond how the market has historically understood it. We also recognize that the market is increasingly focused on demonstrated progress in tenant leasing and contracted megawatts. We intend to communicate clearly as our pipeline advances.
MARA is redefining itself as a digital infrastructure company designed to control and monetize high- value energy assets across multiple compute markets. This transition is already underway and Q1
2026 was an important step forward. The work ahead is to execute with discipline, convert strategy into signed contracts and contracted megawatts, and ultimately create measurable shareholder value.
Sincerely,
MARA Chairman & CEO
SHAREHOLDER LETTER
Q1
2026⁹
Highlights – As of
March 31, 2026, we delivered record energized hashrate of
72.2
EH/s, increasing
33% from
54.3
EH/s as of
March 31, 2025. – Revenues decreased
18% to
$174.6 million in
Q1
2026 from
$213.9 million in
Q1
2025. – At
March 31, 2026, we held
35,303
BTC (including digital assets - receivable, net). During
Q1
2026, we produced
2,247
BTC at an average price of
$76,288 and sold
20,880
BTC at an average price of
$70,137. – Total blocks won decreased
2% in
Q1
2026 to
653 from
666 in
Q1
2025. – Our cost per kWh was
$0.04 for our owned sites in
2026.
Purchased energy cost per bitcoin was
$40,047 in
Q1
2026, up from
$35,728 in
Q1
2025. – Cost per petahash per day improve d
3% from
$28.5 in
Q1
2025 to
$27.6 in
Q1
2026. – Net loss was
($1.3 billion), or
($3.31) per diluted share, in
Q1
2026 compared to net loss of
($533.4 million), or
($1.55) per diluted share, in
Q1
2025. Net loss during the quarter includes
$1.0 billion loss related to the fair value of digital assets – Adjusted EBITDA was
($1.0 billion) in
Q1
2026, compared to
($483.6 billion) in
Q1
2025, primarily due to a decrease in the fair value of our bitcoin holdings. – Combined unrestricted cash and cash equivalents and
BTC (including bitcoin loaned or pledged as collateral) of
$2.9 billion as of
March 31, 2026. – Deployed approximately
5,000 new miners with current fleet efficiency of
17.6 joules per terahash ("J/TH") as of
March 31, 2026. – Loaned
5,742
BTC under our digital asset management strategy, generating approximately
$6.4 million of interest income for the quarter ended
March 31, 2026. – Realigned business operations and reduced workforce by 15%, providing combined annualized savings of
$12 million. – No at-the-market offering program ("ATM") usage since
September 2025. – Strengthened balance sheet by retiring ~
30% of outstanding convertible debt at a discount of 9% to par value. – Announced a definitive agreement to acquire Long
Ridge, a 505 MW³ nameplate flexible compute campus with immediate cash flow expected upon closing. – Completed our acquisition of a majority interest in Exaion and are actively advancing its integration to expand our private cloud capabilities. – Progressed Starwood strategic partnership from announcement to active development, with ~90% of non-hosted capacity under consideration for digital infrastructure site conversion. – Improved mining fleet efficiency through acquisition of
2.4 EH of next-generation used ASIC miners at favorable pricing.
First Quarter
Production Highlights
1.
Defined as the total amount of block rewards including transaction fees that MARA earned during the period divided by the total amount of block rewards and transaction fees awarded by the Bitcoin network during the period.
2.
Defined as the amount of hashrate that could theoretically be generated if all miners that have been energized are currently in operation including miners that may be temporarily offline.
Hashrates are estimates based on the manufacturers’ specifications. All figures are rounded.
3.
Currently authorized to sell 485 MW; expected to increase to full 505 MW nameplate in 2H 2026.
SHAREHOLDER LETTER
Q1
2026¹⁰
REVENUE
Our revenues decreased
18% to
$174.6 million from
$213.9 million in the first quarter of
2025.
This decrease was primarily driven by an
18% decrease in the average price of bitcoin, which contributed approximately
$33.1 million to the decrease, with the remaining
$2.5 million attributable to a decrease in bitcoin production. In addition, a
$3.7 million decrease in other revenues, was primarily reflecting revenue from other digital assets and hosting services in the prior year period.
We produced an average of
25.0
BTC each day during the first quarter of
2026, compared to
25.4
BTC each day during the prior year pe riod, which resulted in³⁹ less
BTC mined in the first quarter of
2026 compared to the prior year period. In
Q1 2026, we produced
2,247
BTC compared to
2,286 in
Q1 2025. Furthermore, we saw a
2% decrease in the number of blocks won in the quarter compared to the first quarter of last year.
*Price of BTC as of last day of quarter
NET
LOSS
We reported net loss of
($1.3 billion), or
($3.31) per diluted share, in the first quarter of
2026, compared to net loss of
($533.4 million), or
($1.55) per diluted share, in the first quarter of
2025.
The
$729.0 million increase in net loss was primarily driven by a
$520.4 million increase in operating loss, largely due to unfavorable bitcoin mark-to-market adjustments of
($1.0 billion) and restructuring costs of
$45.9 million during the quarter.
The price of BTC declined
22% from
December 31, 2025 to
March 31, 2026, resulting in net loss being negatively impacted by a change in fair value of digital assets
(including digital assets - receivable, net) of
($1.0 billion) during the first quarter of
2026.
SHAREHOLDER LETTER
Q1
2026¹¹
PURCHASED ENERGY COSTS
We define purchased energy costs as the amount paid to power providers for power consumed related to our owned Bitcoin mining operations. Our purchased energy costs in the first quarter of
2026 were
$44.7 million, compared to
$43.5 million in the prior year period. The increase was primarily driven by the expansion of our owned mining sites and a
33% increase in our total hashrate to
72.2
EH/s.
Our c ost per kWh was
$0.04 for our owned sites in
Q1
2026. Purchased energy cost per bitcoin for our owned and operated sites was
$40,047 in
Q1
2026, compared to
$35,728 in
Q1
2025. The increase was primarily due to higher global network difficulty, which outpaced our hashrate growth and reduced bitcoin mined per unit of energy. The increase in power costs was largely driven by adverse weather events.
OPERATING AND MAINTENANCE COSTS
Operating and maintenance costs during the first quarter of
2026 totaled
$30.6 million compared to
$19.8 million in the prior year period, an increase of
$10.8 million. The increase was primarily due to a
$5.4 million acceleration in the amortization of spare parts used to repair miners, maintenance costs associated with the expansion of our mining fleet and increased labor costs to support a larger operational footprint.
THIRD-PARTY HOSTING AND OTHER
ENERGY COSTS... (truncated)f co- location services related to third-party hosted sites and energy expenses related to mining digital assets other than bitcoin. Third-party hosting and other energy costs in the first quarter of
2026 were
$70.0 million, compared to
$68.2 million in the prior year period, an increase of
$1.9 million. The increase was primarily driven by higher power consumption and utilization at certain third-party hosted sites, partially offset by downtime due to winter storms at other third-party hosted sites during the quarter.
COST PER PETAHASH
Our cost per petahash per day improve d
3% from
$28.5 in the first quarter of
2025 to
$27.6 per petahash per day in the first quarter of
2026. Over the past 11 quarters, our cost per petahash has improved by
42%.
SHAREHOLDER LETTER
Q1
2026¹²
GENERAL AND ADMINISTRATIVE
In the first quarter of
2026, general and administrative
("G&A") expenses, excluding stock-based compensation, were
$57.7 million, compared to
$36.9 million in the prior year period. The increase reflects the scaling of our operations, higher personnel costs associated with headcount growth from the prior year period, and administrative fees in support of our expanded global footprint through acquisition and integration costs.
Included in our G&A in the first quarter of
2026 was acquisition and integration costs of
$11.0 million.
During the quarter, we realigned our business operation s and reduced workforce by 15%, providing combined annualized savings of
$12 million.
This was a difficult decision, but a deliberate one. The organization required to scale a Bitcoin mining platform is not the same organization required to build a digital infrastructure company, and as we expand into AI and digital infrastructure monetization, we need sharper focus and a talent base aligned with where MARA is going. We are grateful to the colleagues who helped build this company, and we believe these changes position us well for the next chapter. Following this restructuring, we expect our quarterly G&A run-rate, excluding stock- based compensation and acquisition and integration costs, to trend below the Q1 level as these savings are realized over time.
DEPRECIATION AND AMORTIZATION
Depreciation and amortization in the first quarter of
2026 was
$191.6 million, a
$33.7 million increase compared to the prior year period. The
21% increase was primarily driven by the
$20.1 million of accelerated depreciation of certain mining rigs, as well as the deployment of additional mining rigs and expansion of our business.
ADJUSTED EBITDA
Adjusted EBITDA in the first quarter of
2026 was
($1.0 billion), compared to
($483.6 million) in the prior year
*including BTC loaned, actively managed or pledged as collateral period.
While first quarter
2026 revenue declined compared to the prior year period, the decrease in bitcoin price led to a significant negative mark-to-market change in the fair value of digital assets.
Financial statements
Income Statement
Three Months Ended March 31, — (unaudited) (in thousands, except share and per share data)
| Three Months Ended March 31, – 2026 | Three Months Ended March 31, – 2025 | ||
|---|---|---|---|
| Revenues | 174,614 | 213,884 | |
| Costs and operating expense | Purchased energy costs | 44,732 | 43,481 |
| Costs and operating expense | Operating and maintenance costs | 30,632 | 19,794 |
| Costs and operating expense | Third-party hosting and other energy costs | 70,048 | 68,183 |
| Costs and operating expense | General and administrative | 86,857 | 85,865 |
| Costs and operating expense | Depreciation and amortization | 191,556 | 157,897 |
| Costs and operating expense | Change in fair value of digital assets | 714,677 | 394,162 |
| Costs and operating expense | Change in fair value of derivative instrument | 41,045 | -26,828 |
| Costs and operating expense | Taxes other than on income | 2,430 | 3,095 |
| Costs and operating expense | Research and development | 8,248 | 9,298 |
| Costs and operating expense | Restructuring costs | 45,885 | |
| Costs and operating expense | Total costs and operating expense | 1,236,110 | 754,947 |
| Costs and operating expense | Operating loss | -1,061,496 | -541,063 |
| Other loss | Change in fair value of digital assets - receivable, net | -303,912 | -116,067 |
| Other loss | Net gain from extinguishment of debt | 70,557 | |
| Other loss | Interest income | 10,532 | 11,995 |
| Other loss | Interest expense | -10,720 | -9,941 |
| Other loss | Equity in net earnings of unconsolidated affiliate | -2,171 | -13 |
| Other loss | Other | 3,881 | 2,474 |
| Other loss | Total other loss | -231,833 | -111,552 |
| Other loss | Loss before income taxes | -1,293,329 | -652,615 |
| Other loss | Income tax benefit | 30,932 | 119,172 |
| Other loss | Net loss | -1,262,397 | -533,443 |
| Other loss | Less: net loss attributable to noncontrolling interest, including redeemable noncontrolling interest | 2,778 | 244 |
| Other loss | Net loss attributable to common stockholders | -1,259,619 | -533,199 |
| Other loss | Net loss per share of common stock - basic and diluted | -3.31 | -1.55 |
| Other loss | Weighted average shares of common stock - basic and diluted | 380,157,050 | 344,098,009 |
Income Statement
Three Months Ended March 31, — 2026 (in thousands, except share and per share data)
| Three Months Ended March 31, – 2026 | Three Months Ended March 31, – 2025 | ||
|---|---|---|---|
| Reconciliation to Adjusted EBITDA: | Net loss attributable to common stockholders | -1,259,619 | -533,199 |
| Reconciliation to Adjusted EBITDA: | Interest expense (income), net | 188 | -2,054 |
| Reconciliation to Adjusted EBITDA: | Income tax benefit | -30,932 | -119,172 |
| Reconciliation to Adjusted EBITDA: | Depreciation and amortization | 194,739 | 161,002 |
| Reconciliation to Adjusted EBITDA: | EBITDA | -1,095,624 | -493,423 |
| Reconciliation to Adjusted EBITDA: | Stock-based compensation expense | 30,506 | 49,115 |
| Reconciliation to Adjusted EBITDA: | Change in fair value of derivative instrument | 41,045 | -26,828 |
| Reconciliation to Adjusted EBITDA: | Restructuring costs | 45,885 | |
| Reconciliation to Adjusted EBITDA: | Acquisition and integration costs | 11,018 | |
| Reconciliation to Adjusted EBITDA: | Net gain from extinguishment of debt | -70,557 | |
| Reconciliation to Adjusted EBITDA: | Net gain on investments | -12,429 | |
| Reconciliation to Adjusted EBITDA: | Adjusted EBITDA (1) | -1,037,727 | -483,565 |